MyRoofPortal Compare my quotesStart free

South Florida roofing

Know what’s in your roof quote before you sign.

See which materials and repairs each roofer includes. Get the questions to ask before you choose.

See a sample

Reading your paperwork. This takes about half a minute — keep this page open and it will move on by itself.

No account, no card. How we handle your documents.

Tile roof on a two-story South Florida home
The lines that decide itIllustrative sample Proposal A Proposal B Proposal C License & insurance License only Both attached Not stated Underlayment system One layer Two, named Not stated Registers the warranty Not stated Yes, in 30 days You do

What kind of roof are you comparing?

Choose a system to see its questions.

Roof questions

What to ask before the roof goes on.

Use the written answers to compare what each roofer has allowed for. The sheet follows your roof — 104 line items in all, and a tile job is not asked the same things as a shingle job.

Start my comparison

Two ways the same word is used
Cap sheet Base sheet, fastened Roof deck Base sheet first A fastened sheet goes down, then the cap bonds to it. Two layers.
Membrane Adhered to the deck Roof deck Direct to deck One membrane sticks straight to the wood. No sheet underneath.

Both get called “underlayment”. Which one a quote means changes what it costs, what the manufacturer will warrant and what happens when the deck moves. A drawing, not a photograph of your roof.

Underlayment and edge details during a tile reroof
Underlayment and edge details go on before the tile does, which is why they are easier to ask about than to inspect afterwards.

The cheapest quote is the shortest one.

A roof quote is a one-page number sitting on top of about twenty decisions.

1

What’s left off isn’t visible

Nothing on a short quote says “re-using your old flashing” or “no allowance for rotten wood.” It just isn’t there, and there’s no line to compare it against.

2

The open items land on you later

“Decking priced as needed” is not a price. Once the old roof is off and the crew is on site, you’re negotiating from the worst possible position.

3

Warranties have conditions nobody reads

The long manufacturer warranty usually needs a certified installer and a registration after the job. Miss either and you have the basic one.

How the comparison works

01

Add a proposal

Start with a PDF or a photo. Add another proposal whenever you have one — or read it out loud and we’ll write it down.

02

Review the details

Check the products, allowances and prices against the contractor’s own wording. Nothing is treated as fact until you confirm it.

03

Ask for written answers

Take a short question list back to each roofer before you sign, worded so the answer has to be specific.

Then keep track of the job

Picking a contractor is the middle of it, not the end.

Comparing quotes — Get at least three written quotes
Contractor chosen — Get the final quote re-issued with every answer written into it
Contract signed — Keep a signed copy with the spec sheet attached
Permit applied for — Confirm the permit is in the contractor's name
Materials ordered and scheduled — Check the delivery ticket: the product and color match what you agreed
Install under way — Photograph the bare deck before the new roof covers it
Final inspection — Confirm the county inspection passed
Done — paperwork in hand — The written manufacturer warranty and your proof of purchase, kept together

Your proposal

Roof type
Proposal filesPDFs or photos
So we have a way to reach you about this comparison. Save the link too — that is what opens it.

Reading your paperwork. This takes about half a minute — keep this page open and it will move on by itself.

Bookmark the page you land on — that link is what opens your comparison, so keep it the way you would keep a key. Nothing is treated as fact until you confirm it. We don’t sell your details, we don’t bid on your roof, and nobody calls you. How we handle your documents.

Standing-seam metal roof seen from above Photo: Roof Sentry Care Club

What you’ll see

A line-by-line view of what each proposal includes.

Sample proposal B

Decking replacement

Included in the quote3 sheets
Each additional sheet$95
A question to take to your roofer

How will I know if more than three sheets need replacing?

Have a roof quote in hand?

Start with one proposal. Add more when you’re ready.

Compare my quotes

Photos by Roof Sentry Care Club